Construct
one of the largest domed air structures in the northeast. Presentation
to township officials and community demonstrated that the structure's
height was in compliance with zoning and that there would be minimal
impact to the environment. Multiple discussions with state code
officials to ensure all codes were complied with to obtain recognition
as a temporary structure.
The design included the construction of a perimeter concrete wall
to raise the dome above grade to prevent snow loading at the base.
|
 |
 |